What is a Line Stop?

This procedure involves inserting a temporary plug in an existing water main or sewer main. Additionally, double stops can be done with a bypass connector used to keep the main flowing while work is done on the isolated section.

Line Stops

We provide Line Stops for the following customers:

• Municipalities
• Developers
• Contractors
• Schools
• And other customers

Our Portfolio of Line Stops

Three samples of line stops from our portfolio:

1. Northwest Anthony Henday Rind Road - 42 inch concrete cylinder pipe water main with bypass, a 36 inch
    concrete cylinder pipe (CCP) sewer force main with bypass, and a 22 inch steel and 18 inch asbestos
    cement line stop
2. Royal Glenora Club (Edmonton, AB) - 20 inch steel double stop
3. Town of Devon - 18 inch steel single stop