The traditional method of adding a lateral involves shutting down the main at the nearest valve location perhaps some distance away then cutting in a "tee." Take advantage of what many municipalities, towns, and waterworks contractors have found.
Hot Taps allow you to make connections into existing mains without turning water off.
There is
- no water loss
- no need for temporary water to be set up
- no re-chlorination necessary and
- no disruption to comsumers.
At N.S. PAWLIUK AND SON CONTRACTING LTD. we offer an array of choices.
Hot Taps are available for
Tap sizes range from 3/4 inch to 18 inches.
The procedure takes approximately 2-3 hours to complete, depending on conditions and watermain location.